Spring Field Review Site 05B 2006AsheAdd-On Site
~ The Bridge Construction Engineers took the opportunity to explain how the screed is set up to achieve the grade profile shown on the plans.
 ~ This discussion shed more light on the challenges of screeding for the cross-slope shown on plans especially when rollover occurs on the bridge or the bridge is on a heavy skew.
New screed was set up on the bridge in preparation for a deck pour.
Was this page helpful?